I am following Eric McGinnis Glock-19 Blender Tutorial but I am adapting it to 3Ds Max
I have completed 4hrs and 45minutes of content from the tutorial videos out of 18hrs and 20mins. This leaves me with 15.6 hrs left. Meaning I need to get through 5.3 hours of content per week to finish this project by the 24th. This is gonna be super challenging. It will take me like ~15 hours a week to meet those requirements.
I have already completed the Reference Gathering, Scale, and Block Out part of this assignment. I have already started the High Poly and Boolean process.
Schedule:
4/8: Blocking Done
4/15: High Poly Done
4/22: Low Poly/Game Ready Done
4/24: Texturing/Rendering Done
![]() |
References |
![]() |
Scale_01 |
![]() |
Scale_02 |
![]() |
Blocked Out Every Part |
![]() |
Orthographic Matching the Concept |